Water Efficiency Fund (WEF)
Co-funds high water users for water audits, pilot studies, recycling plants, water-efficient equipment and demonstration of innovative water solutions.
- Support
- Water efficiency assessment: 70% up to S$30,000. Pilot study: 70% up to S$150,000. Recycling/alternative water: lower of S$0.71/m3 PW, S$0.45/m3 NEWater, S$0.37/m3 IW saved (up to 15 yrs) or 50% of capital cost, cap S$5m. Water-efficient equipment: same incentive or 50% of TQC, cap S$300,000. IWSDF cap S$5m.
- Maximum funding
- S$5,000,000
- How to apply
- Hard-copy application to WEF Administrator, PUB (pub_conserve@pub.gov.sg for pre-consultation)
- Apply before starting?
- Yes, before any commitment or payment
Recent changes
Application form updated 2 Jan, 25 May and 31 Jul 2026; rates unchanged since 2023 enhancement (assessment/pilot to 70%, pilot cap S$150k, recycling cap S$5m).
Who is eligible
- Registered and operating in Singapore
- Premises using at least 1,000 m3/month (smaller premises can apply collectively); IWSDF needs 10,000 m3/month
- Pilot/recycling: at least 10% water savings or 6,000 m3/year; equipment: at least 1,200 m3/year savings; IWSDF: at least 5% savings with emerging technology
- Not for rainwater harvesting, water-efficient fittings, or measures required by regulation
- Project starts only after PUB approval
Quick eligibility check
- 1. Does your premises use at least 1,000 m3 of water per month (or can you apply jointly with other premises)?
- 2. Will the project save at least 1,200 m3 a year (equipment) or 10%/6,000 m3 a year (recycling)?
- 3. Is the project NOT rainwater harvesting or simple water-efficient fittings?
- 4. Is the project NOT something you must do by regulation?
- 5. Have you NOT started the project before PUB approval?
- 6. Can you get at least 3 vendor quotations?
0 of 6 answered.
What it covers
- Water meters, instrumentation, lab tests (assessment)
- Pilot plant
- Full-scale recycling plant
- Water-efficient equipment and installation
How to apply
- Consult the WEF Administrator
- Complete the relevant section of the WEF application form
- Attach endorsed supporting documents and 3 quotations
- Mail one copy to PUB
- Start only after Letter of Offer; complete within 12 months
Claims: Assessment: on completion, Water Efficient Building (Basic) certification and approved report. Pilot/recycling: 50% on commissioning, balance on report (recycling: year 3 with 75% of savings achieved).
Documents you need
- WEF application form (relevant section) endorsed by CEO/MD
- ACRA records dated within 1 year
- 6 months of water bills
- Consultant proposal / project proposal written by applicant
- Minimum 3 budgetary quotations on vendor letterhead
- Meter installation schematic (if metering)
- Declaration on other government incentives and no related-party transactions
Frequently asked questions
What is the Water Efficiency Fund?
Co-funds high water users for water audits, pilot studies, recycling plants, water-efficient equipment and demonstration of innovative water solutions.
How much funding does WEF give?
Water efficiency assessment: 70% up to S$30,000. Pilot study: 70% up to S$150,000. Recycling/alternative water: lower of S$0.71/m3 PW, S$0.45/m3 NEWater, S$0.37/m3 IW saved (up to 15 yrs) or 50% of capital cost, cap S$5m. Water-efficient equipment: same incentive or 50% of TQC, cap S$300,000. IWSDF cap S$5m.
Who is eligible for WEF?
Applicants must be registered and operating in Singapore. Premises using at least 1,000 m3/month (smaller premises can apply collectively); IWSDF needs 10,000 m3/month Pilot/recycling: at least 10% water savings or 6,000 m3/year; equipment: at least 1,200 m3/year savings; IWSDF: at least 5% savings with emerging technology Not for rainwater harvesting, water-efficient fittings, or measures required by regulation Project starts only after PUB approval
How do I apply for WEF?
Apply through Hard-copy application to WEF Administrator, PUB (pub_conserve@pub.gov.sg for pre-consultation). You must apply before the project starts or any payment is made.
What documents do I need for WEF?
WEF application form (relevant section) endorsed by CEO/MD; ACRA records dated within 1 year; 6 months of water bills; Consultant proposal / project proposal written by applicant; Minimum 3 budgetary quotations on vendor letterhead; Meter installation schematic (if metering); Declaration on other government incentives and no related-party transactions.
Sources
- Official page: https://pub.gov.sg/Public/WaterLoop/Water-Conservation/Incentives-and-Grants/Water-Efficiency-Fund
- https://www.pub.gov.sg/-/media/WDMI/Application-Information-on-Water-Efficient-Fund-31-Jul-2026.pdf
Information last verified on 23 Oct 2026. Grant rules change often. Always confirm with PUB, Singapore's National Water Agency before you apply.